
Fig. 1. Due to their design, modern RBD lines require less drive energy than previous lines. © Niehoff
Fig. 1. Due to their design, modern RBD lines require less drive energy than previous lines. © Niehoff
Delivery of the first low-carbon emissions wire rod coils at Waelzholz in Hagen, Germany. © Arcelor Mittal
Fig. 2: Typical semi-finished product geometries that were successfully produced using the friction-induced recycling process. © LUF
Starting in 2024, Schaeffler will purchase electricity from wind turbines with a total capacity of 18MW for five years. © Schaeffler
From left to right: Lars Gestranius, Director, Project Engineering & Quality; Daria Graul, Quality Manager; and Lars Fagerholm, President, Davis-Standard Infrastructure Business Unit, Maillefer Group. © Maillefer
Leviton announced a £600,000 capital investment into solar energy at its Glenrothes manufacturing facility, © Leviton