Current contents

Siemens-Capital.jpg

E/E groups will work in a highly unified design environment that improved first-time-right electrical harness quality and smoother supply chain integration. © Siemens

 
17/01/2022 – Next generation electrical/electronic (E/E) systems development

Next generation electrical/electronic (E/E) systems development

Siemens‘ “Capital” software selected by Airbus

Siemens announced that Airbus has selected “Capital” electrical/electronic (E/E) systems development software from Siemens‘ “Xcelerator” portfolio to accelerate ... By  Jörg Dambock
Tisco-RSB.jpg

The satisfied customer together with the Kocks service team in front of the “RSB 5.0”. © Kocks

 
14/01/2022 – Final Acceptance Certificate

Final Acceptance Certificate

Shanxi Taigang Stainless Steel grants FAC to Kocks

The Chinese stainless steel producer Shanxi Taigang Stainless Steel Company Co. Ltd. (Tisco) issued to Friedrich Kocks GmbH+Co KG, Germany, the FAC (Final ... By  Jörg Dambock
Tuulivoima.png

Outokumpu has signed another 10-year power supply agreement for renewable wind power with Gasum. © Outokumpu

 
13/01/2022 – Outokumpu further increases share of wind power

Outokumpu further increases share of wind power

Ambitious climate targets

Outokumpu has signed another 10-year power supply agreement for renewable wind power with Gasum. The new deal is an addition to the earlier wind power ... By  Jörg Dambock
Verseilmaschine-Krupp.jpg

The telemetry system “RTM X42” consists of the wire tension measuring system, the control center, and the brake system. © FMS

 
12/01/2022 – Modernisation / Stranding

Modernisation / Stranding

Fit for future in only 4 days

How does a virtually indestructible basket style stranding machine, Krupp stranding machine “KVR 8x1400” with reverse twist, manage to be upgraded to meet ... By  Jörg Dambock
Laiwu.jpg

Final Acceptance Certificate for the 3-roll Reducing+Sizing Block (RSB) 500++/4 in 5.0 design. © Kocks

 
12/01/2022 – Final Acceptance Certificate

Final Acceptance Certificate

Shandong Iron and Steel issued FAC to Kocks

The Chinese state-owned steel producer Shandong Iron and Steel Group Co Ltd. (SGIS) issued to Friedrich Kocks GmbH+Co KG, Germany, the FAC (Final Acceptance ... By  Jörg Dambock
Pyromet.jpg

The construction phase is due to start during the second quarter of 2022. © Tenova

 
11/01/2022 – Upgrade of PGM smelting furnace

Upgrade of PGM smelting furnace

Sibanye-Stillwater selects Tenova Pyromet

Tenova Pyromet, a Tenova company specialising in the design and supply of submerged arc furnace technology for the metals industry, has been selected by ... By  Jörg Dambock
James-R-York-WAI-president.jpg

James R. York is the new WAI-president for a one-year term that commenced on January 1, 2022. © WAI

 
10/01/2022 – On our own behalf - Wire

On our own behalf - Wire

Week 01/2022 in retrospect

Here, we present you the top articles from our four categories. This week, the most read one comes from the category „Business“. By  Daniel Keienburg

Topics