Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

01/03/2024 – Reducing costs and energy consumption in blasting

Higher Overall-Equipment-Effectiveness

Improving the cost-effectiveness of production processes has always been an important task, especially to increase your own competitiveness. In the recent past, this need has become even more pressing. The reduction of energy consumption, and thus of the costs for gas and electrical power, has taken on a completely new dimension.

Previous image Next image
blasting.jpg

Fig. 8: OEE: Comparison of blasting costs for 1000 h of production © Eggersmann

 
Blasting.jpg

Fig.10: Water wettability before and after PantaTec blasting © Eggersmann

 
blasting.jpg

Fig. 11: Filling automatic dosing unit Injecto 05 © Eggersmann

 
blasting.jpg

Fig. 9: Crane manufacturer components © Eggersmann

 
blasting.jpg

Fig. 2: Fully installed dosing system on a large blasting system with 12 blast wheels © Eggersmann

 
blasting.jpg

Fig. 1: Example of a medium size blasting system: Cost comparison blasting and degreasing (blue-green) vs. wet-chemical (blue-red) © Eggersmann

 
blasting.jpg

Fig. 6: Blasting media with too much dust © Eggersmann

 
blasting.jpg

Fig. 7: Blasted but not clean © Eggersmann

 
blasting.jpg

Fig. 8: OEE: Comparison of blasting costs for 1000 h of production © Eggersmann

 
blasting.jpg

Fig. 3&4: Greasy steel parts before surface treatment © Eggersmann

 
blasting.jpg

Fig. 3,4: Greasy steel parts before surface treatment © Eggersmann

 
blasting.jpg

Fig. 5: Prematurely clogged Filter © Eggersmann

 
Back to article

Further articles for:

  • Blast cleaning
  • shot blasting plant
  • surface treatment
Jörg Dambock
Editor-in-chief

Jörg Dambock

Eggersmann Gruppe GmbH+Co. KG

  Show company
  • Most read
  • Latest

08/05/2026

OMV and XRG complete transactions to create “Borouge International”

Boosting global chemicals leadership

By  Jörg Dambock

13/05/2026

Favorable return to Milwaukee, Wisconsin

Energy, information exchange marked “Wire Expo 2026”

By  Jörg Dambock

12/05/2026

Appointment of President and CEO

Andy Zinner succeeds Robert Wild

By  Jörg Dambock

11/05/2026

“FC Mold X” provides “CSP Nexus” with adaptive mold flow control

ABB and SMS sign a cooperation agreement

By  Jörg Dambock

11/05/2026

Most‑Read Insights

Top 5 of the Week – 19/2026

By  Daniel Keienburg

15/05/2026

Wire Expo 2026

Advanced masterbatch solutions for the cable industry

By  Jörg Dambock

13/05/2026

Favorable return to Milwaukee, Wisconsin

Energy, information exchange marked “Wire Expo 2026”

By  Jörg Dambock

12/05/2026

Appointment of President and CEO

Andy Zinner succeeds Robert Wild

By  Jörg Dambock

11/05/2026

Most‑Read Insights

Top 5 of the Week – 19/2026

By  Daniel Keienburg

11/05/2026

“FC Mold X” provides “CSP Nexus” with adaptive mold flow control

ABB and SMS sign a cooperation agreement

By  Jörg Dambock

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • LinkedIn
  • RSS Feed
Meisenbach Logo