Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

26/06/2024 – New developments from Kurre Systems

Changing the pintle during operation

Replacing pintles for holding and winding different spools is time-consuming. In addition to the downtime, this also increases the scrap rate. What if it were possible to change the pintle during operation - without any set-up times or loss of material? Kurre Systems asked itself the very same question.

Previous image Next image
Double-winder-VAP-800.jpg

The fully automated Double winder “VA-P-800” was the first system to utilize the automatic step pintle. © Kurre Systems

 
Pinolen.jpg

The motorized adjustable Pintle gradually adjusts to the required spool diameter. © Kurre Systems

 
Double-winder-VAP-800.jpg

The fully automated Double winder “VA-P-800” was the first system to utilize the automatic step pintle. © Kurre Systems

 
Pinolenwechsel.jpg

The benefits of the new pintle are easily demonstrated using the example OEE calculation. © Kurre Systems

 
Back to article

Further articles for:

  • cable manufacture
  • handling
  • Kurre
  • Kurre Systems
  • rewinding
Jörg Dambock
Editor-in-chief

Jörg Dambock

Kurre Spezialmaschinenbau GmbH

  Show company
  • Most read
  • Latest

25/09/2025

Wire processing

Advanced CNC wire forming and tube bending solutions

By  Jörg Dambock

02/02/2026

Most‑Read Insights

Top 5 of the Week – 5/2026

By  Daniel Keienburg

03/02/2026

SMS completes partial hearth repair in record time at Trinecké Železárny

Targeted partial hearth repair completed in just 42 days

By  Jörg Dambock

30/01/2026

RSB in regular production at Tata Steel in Jamshedpur

Successful integration in India

By  Jörg Dambock

04/02/2026

New 2-Strand Caster from Primetals Technologies

Maanshan Iron and Steel expands plant

By  Jörg Dambock

05/02/2026

Paul Wurth cast iron staves supplied by SMS Group

Dillinger improves blast furnace cooling

By  Jörg Dambock

04/02/2026

New 2-Strand Caster from Primetals Technologies

Maanshan Iron and Steel expands plant

By  Jörg Dambock

04/02/2026

Highly innovative system enables single-operator control of multiple plant sections

Primetals receives ‘Best of Industry’ award for its Central Operation Cockpit solution

By  Jörg Dambock

03/02/2026

SMS completes partial hearth repair in record time at Trinecké Železárny

Targeted partial hearth repair completed in just 42 days

By  Jörg Dambock

02/02/2026

Most‑Read Insights

Top 5 of the Week – 5/2026

By  Daniel Keienburg

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • LinkedIn
  • RSS Feed
Meisenbach Logo