Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

25/03/2026 – Cable manufacture / handling / rewind lines

Built for drum logistics, layer quality, and safer changeovers

Rewinding in a cable plant is rarely a simple transfer. It’s a daily production task: splitting master drums into customer lengths, converting drum types, correcting issues, and preparing lots for downstream steps.

Previous image Next image
Rewind-Station-RW50-S-Copyright-Windak.jpg

Rewind station ‘RW50-S’. © Windak

 
floating-pintle-Copyright-Windak.jpg

Floating pintle. © Windak

 
Rewind-Station-RW50-S-Copyright-Windak.jpg

Rewind station ‘RW50-S’. © Windak

 
Take-up-UW22-Copyright-Windak.png

Take-up ‘UW 22’. © Windak

 
Tire-driven-Take-up-Copyright-Windak.jpg

Tire driven take-up © Windak

 
Back to article

Further articles for:

  • cable manufacture
  • pay-off
  • take up
  • Windak
  • wire 2026
Jörg Dambock
Editor-in-chief

Jörg Dambock

WINDAK OÜ

  Show company
  • Most read
  • Latest

16/09/2026

75 years WIRE – Suzuki Garphyttan marks 120 years

Full circle – revisiting our roots while shaping the future

By  Jörg Dambock

17/09/2026

75 years WIRE – “That was tomorrow”

Stranding technology between vision and production readiness

By  Jörg Dambock

10/09/2026

wire China 2026 / Preview

Future-oriented wire and cable manufacturing equipment

By  Jörg Dambock

18/09/2026

From wire drawing to cold forming

Traxit to become “Cold Forming Field of Application” within Surtec

By  Jörg Dambock

16/09/2026

Statement of Eurometal to CBAM

Reaction to the European Parliament’s position on extending CBAM

By  Jörg Dambock

22/09/2026

The plants will be built for Ganglu Iron and Steel and Jinan Iron and Steel

SMS to build two travelling grate pelletizing plants in China

By  Jörg Dambock

21/09/2026

Most‑Read Insights

Top 5 of the Week – 38/2026

By  Daniel Keienburg

18/09/2026

From wire drawing to cold forming

Traxit to become “Cold Forming Field of Application” within Surtec

By  Jörg Dambock

17/09/2026

75 years WIRE – “That was tomorrow”

Stranding technology between vision and production readiness

By  Jörg Dambock

16/09/2026

Statement of Eurometal to CBAM

Reaction to the European Parliament’s position on extending CBAM

By  Jörg Dambock

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • LinkedIn
  • RSS Feed
Meisenbach Logo