pay-off

Umbaenderungsanlage.jpg

Taping line. © Lukas Anlagenbau

 
30.03.24 – Cable manufacturing

Cable manufacturing

Specific equipment for the wire and cable industry

Lukas Anlagenbau GmbH, from Bavaria/Germany, produces customer specific equipment for the wire and cable industry with special characteristics. Von  Jörg Dambock
drawing-line.jpg

Wet drawing machines with integrated spooler. © M+E Macchine+Engineering

 
21.02.24 – M+E specialize in the design and manufacturing

M+E specialize in the design and manufacturing

Pay-offs, take-ups and wet drawing machines

The M+E Macchine+Engineering S.r.l. have their headquarters in Dervio, on lake Como, about 40 miles north of Milan. Von  Jörg Dambock
Winder-and-pay-off.jpg

Wardwell also offers static payoffs for 150mm, 200mm and 250mm single end spools to feed the winders. © Wardwell

 
02.11.23 – Wire processing / rewinding

Wire processing / rewinding

Impressive program of rewinding machines and payoffs for wire

Wardwell, long known for its line of braiding machines, offers an equally impressive program of rewinding machines and payoffs for wire. Von  Jörg Dambock
Stationary-capstan-take-up-.jpg

Stationary capstan take-up frame for galvanized wire coiling. © M+E

 
M+E machines are individually developed to meet the most demanding customer requirements. Each machine consists of a combination of standard assemblies ... Von  Jörg Dambock
braider-windup.jpg

The braider is equipped with integrated payoff and wind-up mechanisms for 800mm diameter reels. © Wardwell

 
21.04.23 – Cable production

Cable production

Rapid braider, winder and payoff

At “Interwire” Wardwell Braiding Co. will present a rapid braider, winder and payoff, on a joint booth with SKET, Henrich and Spirka. Remarkable technical ... Von  Jörg Dambock
Take-up-and-pay-off-for-Wire.png

The new floor traversable take-up and pay-off meets the demands of heavy load carrying capacity and a broad reel range. © Maillefer

 
30.01.23 – New floor traversable take-up and pay-off

New floor traversable take-up and pay-off

Take-up and pay off “FTU / FPO 100LV”

 Maillefer’s new floor traversing take-up and pay-off 100LV meets the demands of heavy load carrying capacity and a broad reel range. Von  Jörg Dambock
THC-5090.jpg

New member of conical crosshead family: “THC 50/90” for medium and high-voltage cable production. © Maillefer

 
20.01.23 – Three-layer extrusion for MV and HV insulations up to 132kV

Three-layer extrusion for MV and HV insulations up to 132kV

New “THC 50/90” for MV and HV cable production

A new member of the Maillefer conical crosshead family: “THC 50/90” for medium and high-voltage cable production. Von  Jörg Dambock