Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

17/03/2021 – Linxon has successfully put into operation

400kV Storfinnforsen substation in Sweden

The turnkey upgrade for the Storfinnforsen 400/130kV electrical substation has now been fully commissioned. This extension of the existing substation will help the customer – E.ON Energy Networks – and the grid owner – Svenska kraftnät – to better connect several surrounding wind power generating parks to the electricity transmission grid.

Previous image
Sweden-Station-400130kV.jpg

This extension of the existing substation will help the customer – E.ON Energy Networks – and the grid owner – Svenska kraftnät – to better connect several surrounding wind power generating parks to the electricity transmission grid. © Linxon

 
Sweden-Station.jpg

The turnkey upgrade for the Storfinnforsen 400/130kV electrical substation has now been fully commissioned. © Linxon

 
Frdric-Trfois-CEO-Linxon.jpg

“This was the first contract we won in Sweden since becoming Linxon”, said Frédéric Tréfois, CEO of Linxon. © Linxon

 
Ingela-Haling.jpg

“Storfinnforsen is also the first station Linxon commissions in Sweden”, said Ingela Hålling, General Manager of Linxon Sweden. © Linxon

 
Sweden-Station-400130kV.jpg

This extension of the existing substation will help the customer – E.ON Energy Networks – and the grid owner – Svenska kraftnät – to better connect several surrounding wind power generating parks to the electricity transmission grid. © Linxon

 
Back to article

Further articles for:

  • Linxon
  • 400/130kV electrical substation
  • electricity transmission grid
  • SNC-Lavalin
  • Hitachi ABB Power Grids
Jörg Dambock
Editor-in-chief

Jörg Dambock

Linxom

  Show company
  • Most read
  • Latest

16/04/2026

Team discovered exciting innovations

WIRE at “wire 2026”

By  Jörg Dambock

15/04/2026

Back on the show floor

WIRE at “wire 2026”

By  Jörg Dambock

14/04/2026

Insights of “wire 2026”

WIRE at „wire 2026“

By  Jörg Dambock

16/04/2026

Wet blasting

Precision finishing for memory wire

By  Jörg Dambock

21/04/2026

An industry ready for the future: “wire/Tube 2026”

Compelling solutions for new global applications

By  Jörg Dambock

24/04/2026

Synthetic pendants cut mining equipment stress and extend asset life

By  Jörg Dambock

23/04/2026

Cable production

Powering the future of cable manufacturing

By  Jörg Dambock

21/04/2026

An industry ready for the future: “wire/Tube 2026”

Compelling solutions for new global applications

By  Jörg Dambock

20/04/2026

Most‑Read Insights

Top 5 of the Week – 16/2026

By  Daniel Keienburg

16/04/2026

Wet blasting

Precision finishing for memory wire

By  Jörg Dambock

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • LinkedIn
  • RSS Feed
Meisenbach Logo