Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

17/03/2021 – Linxon has successfully put into operation

400kV Storfinnforsen substation in Sweden

The turnkey upgrade for the Storfinnforsen 400/130kV electrical substation has now been fully commissioned. This extension of the existing substation will help the customer – E.ON Energy Networks – and the grid owner – Svenska kraftnät – to better connect several surrounding wind power generating parks to the electricity transmission grid.

Previous image Next image
Ingela-Haling.jpg

“Storfinnforsen is also the first station Linxon commissions in Sweden”, said Ingela Hålling, General Manager of Linxon Sweden. © Linxon

 
Sweden-Station.jpg

The turnkey upgrade for the Storfinnforsen 400/130kV electrical substation has now been fully commissioned. © Linxon

 
Frdric-Trfois-CEO-Linxon.jpg

“This was the first contract we won in Sweden since becoming Linxon”, said Frédéric Tréfois, CEO of Linxon. © Linxon

 
Ingela-Haling.jpg

“Storfinnforsen is also the first station Linxon commissions in Sweden”, said Ingela Hålling, General Manager of Linxon Sweden. © Linxon

 
Sweden-Station-400130kV.jpg

This extension of the existing substation will help the customer – E.ON Energy Networks – and the grid owner – Svenska kraftnät – to better connect several surrounding wind power generating parks to the electricity transmission grid. © Linxon

 
Back to article

Further articles for:

  • Linxon
  • 400/130kV electrical substation
  • electricity transmission grid
  • SNC-Lavalin
  • Hitachi ABB Power Grids
Jörg Dambock
Editor-in-chief

Jörg Dambock

Linxom

  Show company
  • Most read
  • Latest

06/07/2026

Feed fastener to the furnace for heat treatment

New vibration solution

By  Jörg Dambock

08/07/2026

wire/Tube China 2026

China`s leading business platform for the wire and cable industries

By  Jörg Dambock

07/07/2026

Mikrotek presented its comprehensive portfolio at “wire 2026”

Advanced tooling solutions

By  Jörg Dambock

09/07/2026

Sikora sets the course for the future

Dr. Christian Frank hands over CEO position to Alaaddin Aydin

By  Jörg Dambock

10/07/2026

Borealis launches flame-retardant sheathing

Solution for safety-critical power cables

By  Jörg Dambock

14/07/2026

Surface treatment

Utrasonic cleaning systems, specially tailored

By  Jörg Dambock

13/07/2026

Most‑Read Insights

Top 5 of the Week – 28/2026

By  Daniel Keienburg

13/07/2026

Wire manufacturers

Stainless steel wires since 45 years

By  Jörg Dambock

10/07/2026

Borealis launches flame-retardant sheathing

Solution for safety-critical power cables

By  Jörg Dambock

09/07/2026

Sikora sets the course for the future

Dr. Christian Frank hands over CEO position to Alaaddin Aydin

By  Jörg Dambock

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • LinkedIn
  • RSS Feed
Meisenbach Logo