Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

17/03/2021 – Linxon has successfully put into operation

400kV Storfinnforsen substation in Sweden

The turnkey upgrade for the Storfinnforsen 400/130kV electrical substation has now been fully commissioned. This extension of the existing substation will help the customer – E.ON Energy Networks – and the grid owner – Svenska kraftnät – to better connect several surrounding wind power generating parks to the electricity transmission grid.

Next image
Sweden-Station.jpg

The turnkey upgrade for the Storfinnforsen 400/130kV electrical substation has now been fully commissioned. © Linxon

 
Sweden-Station.jpg

The turnkey upgrade for the Storfinnforsen 400/130kV electrical substation has now been fully commissioned. © Linxon

 
Frdric-Trfois-CEO-Linxon.jpg

“This was the first contract we won in Sweden since becoming Linxon”, said Frédéric Tréfois, CEO of Linxon. © Linxon

 
Ingela-Haling.jpg

“Storfinnforsen is also the first station Linxon commissions in Sweden”, said Ingela Hålling, General Manager of Linxon Sweden. © Linxon

 
Sweden-Station-400130kV.jpg

This extension of the existing substation will help the customer – E.ON Energy Networks – and the grid owner – Svenska kraftnät – to better connect several surrounding wind power generating parks to the electricity transmission grid. © Linxon

 
Back to article

Further articles for:

  • Linxon
  • 400/130kV electrical substation
  • electricity transmission grid
  • SNC-Lavalin
  • Hitachi ABB Power Grids
Jörg Dambock
Editor-in-chief

Jörg Dambock

Linxom

  Show company
  • Most read
  • Latest

04/08/2025

Additional 8,000sqft of space and nearly £100,000 on new technology

AWI expands into additional units

By  Jörg Dambock

30/10/2025

“MATdiscover” by Isend

Optimizing quality control in industrial springs

By  Jörg Dambock

29/10/2025

Two independent 3D bending head types in one machine

CNC bending machines for the wire industry

By  Jörg Dambock

31/10/2025

Wireco introduces “Boomfit”

Steel rope for telescopic, crawler, and tower cranes

By  Jörg Dambock

25/09/2025

Innovation, capacity and sustainability

Madem Reels Group announces new plant in Spain

By  Jörg Dambock

05/11/2025

Quality management

UFD40 – Precise Splice Detection for the Wire and Cable Industry

By  Jörg Dambock

04/11/2025

Marking in the cable industry

Precision that connects

By  Jörg Dambock

03/11/2025

On our own account - WIRE

Review of the industry - week 44/2025

By  Daniel Keienburg

03/11/2025

Two 300-ton basic oxygen furnaces (BOF) plus secondary metallurgy now in operation

Extensive expansion of steelmaking plant in record time

By  Jörg Dambock

31/10/2025

Wireco introduces “Boomfit”

Steel rope for telescopic, crawler, and tower cranes

By  Jörg Dambock

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • Twitter
  • RSS Feed
Meisenbach Logo