Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

22/12/2023 – World-first electric vehicle eliminates carbon impact of large construction projects

Zero emission heavy transport now possible

A new zero emission heavy transport vehicle has been created, which can remove the carbon impact of installing large infrastructure such as bridges, wind turbines and power station components.

Previous image
Transport-yard.jpeg

The electric SPMT during an earlier test phase at Mammoet’s yard near Rotterdam, the Netherlands. © Mammoet

 
Transport-windfarm.jpg

An SPMT transporting an offshore wind turbine tower section at Hywind Tampen offshore wind farm in Norway. © Mammoet

 
Transport-.jpeg

The new electric SPMT system will be used to transport electrical transformers. © Mammoet

 
Transport-yard.jpeg

The electric SPMT during an earlier test phase at Mammoet’s yard near Rotterdam, the Netherlands. © Mammoet

 
Back to article

Further articles for:

  • CO2 emissions
  • logistics
  • Mammoet
  • sustainability
Jörg Dambock
Editor-in-chief

Jörg Dambock

Mammoet Global Support B.V.

  Show company
  • Most read
  • Latest

08/05/2026

OMV and XRG complete transactions to create “Borouge International”

Boosting global chemicals leadership

By  Jörg Dambock

13/05/2026

Favorable return to Milwaukee, Wisconsin

Energy, information exchange marked “Wire Expo 2026”

By  Jörg Dambock

12/05/2026

Appointment of President and CEO

Andy Zinner succeeds Robert Wild

By  Jörg Dambock

11/05/2026

“FC Mold X” provides “CSP Nexus” with adaptive mold flow control

ABB and SMS sign a cooperation agreement

By  Jörg Dambock

11/05/2026

Most‑Read Insights

Top 5 of the Week – 19/2026

By  Daniel Keienburg

15/05/2026

Wire Expo 2026

Advanced masterbatch solutions for the cable industry

By  Jörg Dambock

13/05/2026

Favorable return to Milwaukee, Wisconsin

Energy, information exchange marked “Wire Expo 2026”

By  Jörg Dambock

12/05/2026

Appointment of President and CEO

Andy Zinner succeeds Robert Wild

By  Jörg Dambock

11/05/2026

Most‑Read Insights

Top 5 of the Week – 19/2026

By  Daniel Keienburg

11/05/2026

“FC Mold X” provides “CSP Nexus” with adaptive mold flow control

ABB and SMS sign a cooperation agreement

By  Jörg Dambock

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • LinkedIn
  • RSS Feed
Meisenbach Logo