Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

22/12/2023 – World-first electric vehicle eliminates carbon impact of large construction projects

Zero emission heavy transport now possible

A new zero emission heavy transport vehicle has been created, which can remove the carbon impact of installing large infrastructure such as bridges, wind turbines and power station components.

Next image
Transport-windfarm.jpg

An SPMT transporting an offshore wind turbine tower section at Hywind Tampen offshore wind farm in Norway. © Mammoet

 
Transport-windfarm.jpg

An SPMT transporting an offshore wind turbine tower section at Hywind Tampen offshore wind farm in Norway. © Mammoet

 
Transport-.jpeg

The new electric SPMT system will be used to transport electrical transformers. © Mammoet

 
Transport-yard.jpeg

The electric SPMT during an earlier test phase at Mammoet’s yard near Rotterdam, the Netherlands. © Mammoet

 
Back to article

Further articles for:

  • CO2 emissions
  • logistics
  • Mammoet
  • sustainability
Jörg Dambock
Editor-in-chief

Jörg Dambock

Mammoet Global Support B.V.

  Show company
  • Most read
  • Latest

16/04/2026

Team discovered exciting innovations

WIRE at “wire 2026”

By  Jörg Dambock

15/04/2026

Back on the show floor

WIRE at “wire 2026”

By  Jörg Dambock

23/04/2026

Cable production

Powering the future of cable manufacturing

By  Jörg Dambock

21/04/2026

An industry ready for the future: “wire/Tube 2026”

Compelling solutions for new global applications

By  Jörg Dambock

14/04/2026

Insights of “wire 2026”

WIRE at „wire 2026“

By  Jörg Dambock

27/04/2026

Primetals Technologies partners with Polytec for “TrimRob”

A robotic coil trimming and sampling solution

By  Jörg Dambock

24/04/2026

Synthetic pendants cut mining equipment stress and extend asset life

By  Jörg Dambock

23/04/2026

Cable production

Powering the future of cable manufacturing

By  Jörg Dambock

21/04/2026

An industry ready for the future: “wire/Tube 2026”

Compelling solutions for new global applications

By  Jörg Dambock

20/04/2026

Most‑Read Insights

Top 5 of the Week – 16/2026

By  Daniel Keienburg

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • LinkedIn
  • RSS Feed
Meisenbach Logo