Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

07/10/2021 – Fast charging station and suitable infrastructure

Ultrafast-fast charging for heavy vehicles

The decarbonisation of transport is an essential building block for achieving climate targets. The complete electrification of heavy vehicles and buses still requires innovative approaches and an intelligent high-performance charging infrastructure.

Fast-charging-station.jpg

In the MEDUSA project, a rapid charging station for heavy vehicles and passenger cars with a capacity of 3 megawatts is being developed. The development of an intelligent high-performance charging infrastructure is an essential building block for the complete electrification of heavy vehicles and buses. © AIT/GettyImages/Chesky_W, modified.

 
Fast-charging-station.jpg

In the MEDUSA project, a rapid charging station for heavy vehicles and passenger cars with a capacity of 3 megawatts is being developed. The development of an intelligent high-performance charging infrastructure is an essential building block for the complete electrification of heavy vehicles and buses. © AIT/GettyImages/Chesky_W, modified.

 
Back to article

Further articles for:

  • Austrian Institute of Technology
  • Ultrafast-fast charging
  • Research+Development
  • heavy vehicles
Jörg Dambock
Editor-in-chief

Jörg Dambock

AIT – Austrian Institute of Technology GmbH

  Show company
  • Most read
  • Latest

04/08/2025

Additional 8,000sqft of space and nearly £100,000 on new technology

AWI expands into additional units

By  Jörg Dambock

09/09/2025

Wire & Cable 25 Krakow: co-organised by IWMA

Shaping the future of wire and cable industry

By  Jörg Dambock

07/10/2025

Management change

New leadership team in business area Americas and Group Functions

By  Jörg Dambock

08/10/2025

Spring manufacturing

Semi-automatic hydraulic unground spring presetting

By  Jörg Dambock

10/10/2025

Wire manufacturing / spring material

Complete line for efficient spring wire production

By  Jörg Dambock

14/10/2025

Rewinding system with drum weights up to 10 tons

Heavy drums - efficiently rewound

By  Jörg Dambock

13/10/2025

On our own account - WIRE

Review of the industry - week 41/2025

By  Daniel Keienburg

10/10/2025

Wire manufacturing / spring material

Complete line for efficient spring wire production

By  Jörg Dambock

08/10/2025

Spring manufacturing

Semi-automatic hydraulic unground spring presetting

By  Jörg Dambock

07/10/2025

Management change

New leadership team in business area Americas and Group Functions

By  Jörg Dambock

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • Twitter
  • RSS Feed
Meisenbach Logo