Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

31/05/2021 – Cable production

Inductive conductor preheater with automatic inductor change

GH Induction has developed a fully automated cable/conductor preheating system that avoids the risk of production losses due to human errors and greatly increases the production reliability in CCV and CVC production lines for MF and HF cables.

Next image
Cable-heater.jpg

A typical conductor preheater in a production line, placed directly in front of the extrusion head. © GH Induction

 
Cable-heater.jpg

A typical conductor preheater in a production line, placed directly in front of the extrusion head. © GH Induction

 
Leitervorheizung.jpg

In this configuration, the inductors only need to be manually moved to the heating position where the conductor is located . © GH Induction

 
Leitervorheizung.jpg

The "fully automatic" system eliminates the need for manual positioning of the inductors. © GH Induction

 
Kupferleiter.jpg

Typical cable with different insulation layers. © Vatan

 
Back to article

Further articles for:

  • GH Induction
  • GH Electrotermia
  • cable manufacture
  • Preheater
  • Vatan Kablo
Jörg Dambock
Editor-in-chief

Jörg Dambock

GH Induction / GH Electrotermia, S.A.U.

  Show company
  • Most read
  • Latest

12/02/2025

Acquisition of International Industrial Springs

Lesjöfors Group expands into India

By  Jörg Dambock

02/06/2025

On our own account - WIRE

Review of the industry - week 22/2025

By  Daniel Keienburg

04/05/2025

Cable manufacturing

Taping machinery for cable and conductors

By  Jörg Dambock

22/04/2025

Pioneers in welding machine technology

Flexible “PL AKK” series for a non-stop production

By  Jörg Dambock

14/05/2025

Leverage “Duplex 2205”

Managing corrosion in industrial applications

By  Jörg Dambock

02/06/2025

On our own account - WIRE

Review of the industry - week 22/2025

By  Daniel Keienburg

26/05/2025

On our own account - WIRE

Review of the industry - week 21/2025

By  Daniel Keienburg

23/05/2025

Management change

Jake Brown named Hypertherm Associates’ EVP, Global Sales and Marketing

By  Jörg Dambock

22/05/2025

Niehoff technology: Flat wire drawing and annealing

Producing flat copper wire for cable shieldings

By  Jörg Dambock

21/05/2025

Best-ever year of Italian sales

AWI claim record export sales

By  Jörg Dambock

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • Twitter
  • RSS Feed
Meisenbach Logo