Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

02/04/2024 – How to cope with the future

Flexible energy utilization in heat treatment plants

The awareness of decarbonisation has become obvious to all companies, especially in Europe, in recent months and years. However, achieving the EU’s climate targets is not just about the cost of retrofitting or building new heating systems, but also increasingly about the ongoing cost of production.

Next image
Mobile-gas-mixing-station.jpg

Fig. 1: Mobile gas mixing station. © Tenova LOI Thermprocess

 
Mobile-gas-mixing-station.jpg

Fig. 1: Mobile gas mixing station. © Tenova LOI Thermprocess

 
burner.jpg

Fig. 2: Tenova TRKS burner (a); NOx emissions of the TRKS burner with different natural gas/H2 mixtures (b). © Tenova LOI Thermprocess

 
Eco-BAF.jpg

Fig. 3: “ecoBAF” with ultra-low NOx HPH-flameless technology. © Tenova LOI Thermprocess

 
BAF.jpg

Fig. 4: View inside an “eBAF” heating hood with resistance heating sys-tem. © Tenova LOI Thermprocess

 
Back to article

Further articles for:

  • CO2 emissions
  • CO2 footprint
  • heat treatment
  • Loi Thermprocess
  • Tenova
  • wire 2024
Jörg Dambock
Editor-in-chief

Jörg Dambock

LOI Thermprocess GmbH

  Show company
  • Most read
  • Latest

25/09/2025

Wire processing

Advanced CNC wire forming and tube bending solutions

By  Jörg Dambock

13/02/2026

Acquisition

Windak becomes part of Rosendahl Nextrom

By  Jörg Dambock

10/02/2026

“Midrex” plant outputs 2.43 mio t in first year of operation

Tosyali Algérie sets new world DRI production record in 2025

By  Jörg Dambock

20/01/2026

Evolving needs of today’s wire and cable manufacturing workforce

The WAI Education Center expands online video training courses

By  Jörg Dambock

09/02/2026

Most‑Read Insights

Top 5 of the Week – 6/2026

By  Daniel Keienburg

16/02/2026

Most‑Read Insights

Top 5 of the Week – 7/2026

By  Daniel Keienburg

13/02/2026

Acquisition

Windak becomes part of Rosendahl Nextrom

By  Jörg Dambock

10/02/2026

“Midrex” plant outputs 2.43 mio t in first year of operation

Tosyali Algérie sets new world DRI production record in 2025

By  Jörg Dambock

09/02/2026

Most‑Read Insights

Top 5 of the Week – 6/2026

By  Daniel Keienburg

05/02/2026

Paul Wurth cast iron staves supplied by SMS Group

Dillinger improves blast furnace cooling

By  Jörg Dambock

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • LinkedIn
  • RSS Feed
Meisenbach Logo