Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

13/01/2022 – Outokumpu further increases share of wind power

Ambitious climate targets

Outokumpu has signed another 10-year power supply agreement for renewable wind power with Gasum. The new deal is an addition to the earlier wind power agreement with Gasum, announced in September 2021. According to the agreement, deliveries will begin in the summer of 2023.

Tuulivoima.png

Outokumpu has signed another 10-year power supply agreement for renewable wind power with Gasum. © Outokumpu

 
Tuulivoima.png

Outokumpu has signed another 10-year power supply agreement for renewable wind power with Gasum. © Outokumpu

 
Back to article

Further articles for:

  • Outokumpu
  • renewable wind power
  • stainless steel
  • low-carbon electricity
  • sustainability
Jörg Dambock
Editor-in-chief

Jörg Dambock

Outokumpu

  Show company
  • Most read
  • Latest

16/09/2026

75 years WIRE – Suzuki Garphyttan marks 120 years

Full circle – revisiting our roots while shaping the future

By  Jörg Dambock

17/09/2026

75 years WIRE – “That was tomorrow”

Stranding technology between vision and production readiness

By  Jörg Dambock

18/09/2026

From wire drawing to cold forming

Traxit to become “Cold Forming Field of Application” within Surtec

By  Jörg Dambock

10/09/2026

wire China 2026 / Preview

Future-oriented wire and cable manufacturing equipment

By  Jörg Dambock

16/09/2026

Statement of Eurometal to CBAM

Reaction to the European Parliament’s position on extending CBAM

By  Jörg Dambock

22/09/2026

The plants will be built for Ganglu Iron and Steel and Jinan Iron and Steel

SMS to build two travelling grate pelletizing plants in China

By  Jörg Dambock

21/09/2026

Most‑Read Insights

Top 5 of the Week – 38/2026

By  Daniel Keienburg

18/09/2026

From wire drawing to cold forming

Traxit to become “Cold Forming Field of Application” within Surtec

By  Jörg Dambock

17/09/2026

75 years WIRE – “That was tomorrow”

Stranding technology between vision and production readiness

By  Jörg Dambock

16/09/2026

Statement of Eurometal to CBAM

Reaction to the European Parliament’s position on extending CBAM

By  Jörg Dambock

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • LinkedIn
  • RSS Feed
Meisenbach Logo