
The system includes a new generation Electric Arc Furnace (EAF) full platform and a Consteel Evolution, a combination that achieves reduced pollution and CO2 emissions. © Tenova
The system includes a new generation Electric Arc Furnace (EAF) full platform and a Consteel Evolution, a combination that achieves reduced pollution and CO2 emissions. © Tenova
Tenova Italimpianti recently received a contract from Metalloinvest for the reconstruction of the Heating Furnace nr. 2 in the second rolling unit of Alexey Ugarov OEMK, in Russia. © Tenova
The “RSB 500++/4” operates as the finishing unit for the production of straight bars within a dimensional range from Ø 50mm to Ø 160mm. © Friedrich Kocks
The project is scheduled to be completed by early 2023 and is expected to increase the productivity of HBI-1 Plant by more than 10%. © Tenova
The RSB 300++/4 operates as finishing unit for the production of BIC within a dimensional range from Ø 15.0mm up to Ø 50.0mm. © Kocks