Primetals

Agreement-MIDREX-plant.jpg

The agreement for the new “MIDREX” HBI plant was signed by Friedemann Plaul, Senior Vice President Iron- and Steelmaking, Andreas Viehboeck, Executive Vice President and Head of Global Business Unit Upstream, both with Primetals Technologies, and YM Tunku Dato Yacoob Khyra, Executive Group Chairman, and Uwe Ahrens, CTO, both with Khyra-Melewar Group. © Primetals

 
16.07.25 – Maegma Minerals partners with Primetals

Maegma Minerals partners with Primetals

“Midrex” flex plant

Maegma Minerals signed a Memorandum of Understanding (MoU) with Primetals Technologies to establish a “MIDREX” flex plant with a capacity of 2.0 million ... Von  Jörg Dambock
Meist-gelesen-Wire-KW-28 Copyright TLM.jpg

RP6 – For oiled parts and heavy-headed components at STABO Verbindungstechnick, a PennEngineering Company. © TLM

 
14.07.25 – On our own account - WIRE

On our own account - WIRE

Review of the industry - week 28/2025

At this point, we present the five most read articles of the past week. The ranking is based on your click behavior on the website. Von  Daniel Keienburg
Drahtstrasse.jpg

Hot coil on the Morgan Stelmor Cooling Conveyor from Primetals Technologies at Jiangsu Shagang’s line No.3. © Primetals

 
09.07.25 – Wire rod outlet upgrade

Wire rod outlet upgrade

Primetals receives FAC from Jiangsu Shagang

Primetals Technologies has received the final acceptance certificate (FAC) from Jiangsu Shagang for the successful upgrade of the wire rod outlet and the ... Von  Jörg Dambock
Meist-gelesen-Wire-KW-21.jpg

BSC achieves substantial improvements after an EAF upgrade by Primetals Technologies. © Primetals

 
26.05.25 – On our own account - WIRE

On our own account - WIRE

Review of the industry - week 21/2025

At this point, we present the five most read articles of the past week. The ranking is based on your click behavior on the website. Von  Daniel Keienburg
Meist-gelesen-Wire-KW-20.jpg

Representatives from Hoa Phat and Primetals Technologies at the contract signing ceremony. © Primetals

 
19.05.25 – On our own account - WIRE

On our own account - WIRE

Review of the industry - week 20/2025

At this point, we present the five most read articles of the past week. The ranking is based on your click behavior on the website. Von  Daniel Keienburg
EAF-Baku.jpg

BSC achieves substantial improvements after an EAF upgrade by Primetals Technologies. © Primetals

 
19.05.25 – Upgrade project generates electrical energy and electrode consumption savings

Upgrade project generates electrical energy and electrode consumption savings

Baku Steel achieves improvements with EAF Upgrade

Primetals Technologies has recently received the final acceptance certificate (FAC) for an upgrade of the 60-ton electric arc furnace (EAF) at a facility ... Von  Jörg Dambock
Hoa-Phat.jpeg

Representatives from Hoa Phat and Primetals Technologies at the contract signing ceremony. © Primetals

 
13.05.25 – New billet/bloom/beam blank caster and complete wire rod mill

New billet/bloom/beam blank caster and complete wire rod mill

Hoa Phat Group invests in high-quality long casting and rolling line

A contract with Primetals Technologies was signed for the supply and implementation of a long product caster with a capacity of 1 mio. t/y and a rolling ... Von  Jörg Dambock