29/05/2019
Speedy production buffer for 3,000 tons of steel wire coils
Vollert has erected for Saarstahl Neunkirchen a fully automatic high-bay warehouse for up to 665 steel wire coils. The time is 190s per double cycle. The coils weighing up to 4.5 tons are transferred directly from the stacker crane to the lift truck and on to the truck loading.