Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

19/09/2023 – 80 full-thread screws of up to 420mm length produced on a single machine in one minute

Production of specialist wood construction screws

Aachener Maschinenbau GmbH (Amba) has further enhanced its proven All-in-One machines for long-screw production: The machines are now able to produce up to 420-mm-long full-thread screws of 10 mm outside diameter.

Previous image Next image
Vollgewindeschraube.jpg

The All-in-One machines produce the screws continuously, directly from the coil. © Amba

 
Vollgewindeschraube.jpg

The machine produces 80 screws per minute. © Amba

 
Vollgewindeschraube.jpg

The All-in-One machines produce the screws continuously, directly from the coil. © Amba

 
Vollgewindeschraube.jpg

The new-generation machines produce eighty 420-mm-long, 10-mm-diameter (OD) full-thread screws per minute. © Amba

 
Vollgewindeschraube.jpg

The modular design of the All-in-One machines provides screw producers maximum flexibility. © Amba

 
Vollgewindeschraube.jpg

The modular design of the All-in-One machines provides screw producers maximum flexibility. © Amba

 
Georg-Haas.jpg

“In the new drive, we have reduced the flywheel mass to just one third of what it was before,” says Georg Haas, Sales Manager at Amba. “This considerably reduces the machines’ energy consumption.” © Amba

 
Back to article

Further articles for:

  • Aachener Maschinenbau
  • Amba
  • screw making
  • Wire processing
Jörg Dambock
Editor-in-chief

Jörg Dambock

Aachener Maschinenbau GmbH

  Show company
  • Most read
  • Latest

14/10/2026

Wire manufacture

Integrated solutions for welding wire production

by Ann Kathrin Hassenburs

20/10/2026

Coiling the future

Carrying forward an italian engineering legacy

By  Jörg Dambock

08/10/2026

Eder Engineering-Austria celebrates its 80th anniversary

Requirements change, but the goal remains the same

By  Jörg Dambock

19/10/2026

Most‑Read Insights

Top 5 of the Week – 42/2026

By  Daniel Keienburg

06/10/2026

Wire drawing / tools

A revolution in PCD die production technology

By  Jörg Dambock

22/10/2026

Spring manufacturing

NASA returns to spring manufacturer for second Mars rover programme

By  Jörg Dambock

21/10/2026

Quality management

Belden reduces scrap materials and production costs

By  Jörg Dambock

20/10/2026

Coiling the future

Carrying forward an italian engineering legacy

By  Jörg Dambock

19/10/2026

Most‑Read Insights

Top 5 of the Week – 42/2026

By  Daniel Keienburg

14/10/2026

Wire manufacture

Integrated solutions for welding wire production

by Ann Kathrin Hassenburs

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • LinkedIn
  • RSS Feed
Meisenbach Logo