Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

06/07/2021 – Round Value Package Premium

High-speed curing

Recently, Maillefer has successfully commissioned several of the fastest and technologically most advanced high-voltage VCV lines to date.

Previous image Next image
Curing.jpg

“Round Value Package Premium” curing tube. © Maillefer

 
Round-Value-Package.jpg

CV lines are now producing multiple submarine cable campaigns at a record-breaking speed of 1.55 m/min for a 220kV 400 mm2 copper conductor cable core. © Maillefer

 
Curing.jpg

“Round Value Package Premium” curing tube. © Maillefer

 
Round-Premium.jpg

Typical production speed for HV cables on a VCV line with “Round” technology in comparison to a standard VCV line of the same length. Cable constructions are based on Chinese standards. Actual speeds will vary depending on the actual VCV line layout. © Maillefer

 
Back to article

Further articles for:

  • Maillefer Extrusion Oy
  • curing
  • extrusion
  • high-voltage VCV line
  • Round Value Package Premium
Jörg Dambock
Editor-in-chief

Jörg Dambock

Maillefer Extrusion Oy

  Show company
  • Most read
  • Latest

14/11/2025

Steel cable stranding equipment

The future of stranding is here

By  Jörg Dambock

26/12/2025

Elcowire sharpens strategy with stronger customer focus

Christoph Busch steps into a new role as Key Account Manager

By  Jörg Dambock

29/12/2025

LESS and Responsible Steel join forces

Interoperability tool for transparent steel decarbonisation

By  Jörg Dambock

09/12/2025

Leadership transition at Thyssenkrupp Steel Europe

Marie Jaroni appointed CEO

By  Jörg Dambock

02/01/2026

Kocks 3-roll sizing block to boost product flexibility and operational performance

“RSB 370++/6“ strengthens modernization at North American Stainless

By  Jörg Dambock

01/01/2026

New Year's Greetings

A successful new year in 2026

By  Jörg Dambock

31/12/2025

Metix and Magmec sign Memorandum of understanding

Magnesium metal production facility

By  Jörg Dambock

30/12/2025

On our own account

Industry review 2025

By  Editorial staff

30/12/2025

Wire production technology

Celsa modernizes wire rod mill with Primetals

By  Jörg Dambock

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • Twitter
  • RSS Feed
Meisenbach Logo