Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

12/01/2022 – Modernisation / Stranding

Fit for future in only 4 days

How does a virtually indestructible basket style stranding machine, Krupp stranding machine “KVR 8x1400” with reverse twist, manage to be upgraded to meet future process requirements with the shortest possible downtime of only a few days? The project team of Acoteq GmbH employees are now able to provide their thoughts here from lessons learned during the upgrade process.

Next image
Verseilmaschine-Krupp.jpg

The telemetry system “RTM X42” consists of the wire tension measuring system, the control center, and the brake system. © FMS

 
Verseilmaschine-Krupp.jpg

The telemetry system “RTM X42” consists of the wire tension measuring system, the control center, and the brake system. © FMS

 
Korbverseilmaschine-Krupp.jpg

Replacement of the pneumatically operated spool brakes. © FMS

 
Korbverseilmaschine-Krupp.png

Installation of a disc brake system for precise torque control of each individual spool. © FMS

 
Back to article

Further articles for:

  • FMS Force Measuring Systems
  • Acoteq
  • Modernisation
  • stranding
  • telemetry system
  • force measurement
Jörg Dambock
Editor-in-chief

Jörg Dambock

FMS Force Measuring Systems AG

  Show company
  • Most read
  • Latest

04/08/2025

Additional 8,000sqft of space and nearly £100,000 on new technology

AWI expands into additional units

By  Jörg Dambock

17/10/2025

Cable manufactruing / stranding

Large double twist stranders

By  Jörg Dambock

14/10/2025

Rewinding system with drum weights up to 10 tons

Heavy drums - efficiently rewound

By  Jörg Dambock

17/10/2025

Researchers aim to automate air gap measurement

Quality assurance in the production of electric motors

By  Jörg Dambock

10/10/2025

Wire manufacturing / spring material

Complete line for efficient spring wire production

By  Jörg Dambock

21/10/2025

Engineered to maximize production efficiency with automatic cut and transfer

New “Dual Head Spooler”

By  Jörg Dambock

21/10/2025

Zumbach’s inline eccentricity monitoring

Indian cable manufacturer elevates quality

By  Jörg Dambock

20/10/2025

On our own account - WIRE

Review of the industry - week 42/2025

By  Daniel Keienburg

20/10/2025

Cable marking machines and optical fiber processing lines

Close cooperation

By  Jörg Dambock

19/10/2025

Tools

Precision engineering with TW and Nano pressure dies

By  Jörg Dambock

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • Twitter
  • RSS Feed
Meisenbach Logo