Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

21/03/2024 – Operating CV lines responsibly

By-product separator

Byproduct formation during the continuous vulcanizing process has been primarily a cable quality issue, but in this day and age is has equally become an environmental one.

Next image
BPS1.jpg

Typical quality issues on the outer cable surface due to byproducts. © Maillefer

 
BPS1.jpg

Typical quality issues on the outer cable surface due to byproducts. © Maillefer

 
BPS2.jpg

The schema of the BPS loop in a CV process. © Maillefer

 
BPS3.jpg

BPS functionality and construction. © Maillefer

 
BPS4.jpg

BPS functionality and construction. © Maillefer

 
BPS5.jpg

Gas Re-heater. © Maillefer

 
BPS6.jpg

A clean BPS unit before byproduct extraction (left) and the same unit afterwards showing successful residue collection (right) © Maillefer

 
BPS7.jpg

The same unit afterwards showing successful residue collection. © Maillefer

 
Back to article

Further articles for:

  • cable manufacture
  • extrusion line
  • Maillefer
  • Maillefer Extrusion Oy
  • wire 2024
Jörg Dambock
Editor-in-chief

Jörg Dambock

Maillefer Extrusion Oy

  Show company
  • Most read
  • Latest

07/07/2025

Thread rolling

Built to last, modular, and upgradable

By  Jörg Dambock

10/07/2025

Acquisition

Metso divests its ferrous business to SMS Group

By  Jörg Dambock

08/07/2025

On our own account - WIRE

Review of the industry - week 27/2025

By  Daniel Keienburg

08/07/2025

Tata Steel orders pickle line scope from Clecim and ABB consortium

New advanced pickle line at Port Talbot Steelworks

By  Jörg Dambock

09/07/2025

Wire rod outlet upgrade

Primetals receives FAC from Jiangsu Shagang

By  Jörg Dambock

11/07/2025

“Twaron” by Teijin Aramid powers new Bridgestone’s solar car tire

By  Jörg Dambock

10/07/2025

Acquisition

Metso divests its ferrous business to SMS Group

By  Jörg Dambock

09/07/2025

Wire rod outlet upgrade

Primetals receives FAC from Jiangsu Shagang

By  Jörg Dambock

08/07/2025

On our own account - WIRE

Review of the industry - week 27/2025

By  Daniel Keienburg

08/07/2025

Tata Steel orders pickle line scope from Clecim and ABB consortium

New advanced pickle line at Port Talbot Steelworks

By  Jörg Dambock

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • Twitter
  • RSS Feed
Meisenbach Logo