Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

19/02/2021

An alternative to buying a new machine

In some instances, a general overhaul can be an alternative to buying a new machine. In which cases does this make sense and in which not? The tube bending machine manufacturer Schwarze-Robitec provides an overview.

Previous image
overhaul.jpg

An overhauled machine: as good as a new, with state-of-the-art technology. © Schwarze-Robitec

 
Overhaul.jpg

Since expensive parts such as the machine frame and welding components are re-used, an overhauled machine is roughly one-third cheaper than a new machine. © Schwarze-Robitec

 
overhaul.jpg

Hydraulic and electrical installations as well as the entire machine safety system are newly installed during a general overhaul. This is due to the fact that statutory safety regulations have usually changed since the machine was first put into operation. © Schwarze-Robitec

 
overhaul.jpg

An overhauled machine: as good as a new, with state-of-the-art technology. © Schwarze-Robitec

 
Back to article

Further articles for:

  • Schwarze-Robitec
  • Overhaul
  • maintenance
  • Modernisation
Jörg Dambock
Editor-in-chief

Jörg Dambock

Schwarze-Robitec GmbH

  Show company
  • Most read
  • Latest

25/09/2025

Wire processing

Advanced CNC wire forming and tube bending solutions

By  Jörg Dambock

20/01/2026

Evolving needs of today’s wire and cable manufacturing workforce

The WAI Education Center expands online video training courses

By  Jörg Dambock

16/02/2026

Most‑Read Insights

Top 5 of the Week – 7/2026

By  Daniel Keienburg

13/02/2026

Acquisition

Windak becomes part of Rosendahl Nextrom

By  Jörg Dambock

23/02/2026

Most‑Read Insights

Top 5 of the Week – 8/2026

By  Daniel Keienburg

23/02/2026

WIRE 1/2026 February available now

Pre-trade fair issue for “wire 2026“

By  Jörg Dambock

16/02/2026

Most‑Read Insights

Top 5 of the Week – 7/2026

By  Daniel Keienburg

13/02/2026

Acquisition

Windak becomes part of Rosendahl Nextrom

By  Jörg Dambock

10/02/2026

“Midrex” plant outputs 2.43 mio t in first year of operation

Tosyali Algérie sets new world DRI production record in 2025

By  Jörg Dambock

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • LinkedIn
  • RSS Feed
Meisenbach Logo