Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

15/10/2021 – No longer required for continuing operations

Mathiasen sells equipment of American Spring Wire Pengg

Mathiasen Machinery Inc. has been awarded an exclusive contract to sell equipment no longer required for the continuing operations of American Spring Wire Pengg LLC in Bedford Heights, Ohio.

DEM-.jpg

On sale: Two rolling mills one of which is a DEM 4 stand , manufactured in 2015. © Mathiasen

 
DEM-.jpg

On sale: Two rolling mills one of which is a DEM 4 stand , manufactured in 2015. © Mathiasen

 
Back to article

Further articles for:

  • Mathiasen Machinery
  • American Spring Wire Pengg
  • used machines
Jörg Dambock
Editor-in-chief

Jörg Dambock

Mathiasen Machinery, Inc.

  Show company
  • Most read
  • Latest

25/09/2025

Wire processing

Advanced CNC wire forming and tube bending solutions

By  Jörg Dambock

02/02/2026

Most‑Read Insights

Top 5 of the Week – 5/2026

By  Daniel Keienburg

03/02/2026

SMS completes partial hearth repair in record time at Trinecké Železárny

Targeted partial hearth repair completed in just 42 days

By  Jörg Dambock

04/02/2026

New 2-Strand Caster from Primetals Technologies

Maanshan Iron and Steel expands plant

By  Jörg Dambock

05/02/2026

Paul Wurth cast iron staves supplied by SMS Group

Dillinger improves blast furnace cooling

By  Jörg Dambock

05/02/2026

Paul Wurth cast iron staves supplied by SMS Group

Dillinger improves blast furnace cooling

By  Jörg Dambock

04/02/2026

New 2-Strand Caster from Primetals Technologies

Maanshan Iron and Steel expands plant

By  Jörg Dambock

04/02/2026

Highly innovative system enables single-operator control of multiple plant sections

Primetals receives ‘Best of Industry’ award for its Central Operation Cockpit solution

By  Jörg Dambock

03/02/2026

SMS completes partial hearth repair in record time at Trinecké Železárny

Targeted partial hearth repair completed in just 42 days

By  Jörg Dambock

02/02/2026

Most‑Read Insights

Top 5 of the Week – 5/2026

By  Daniel Keienburg

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • LinkedIn
  • RSS Feed
Meisenbach Logo