
Four trade fairs with a total of 400 exhibitors from 21 countries presented current technologies. © Messe Düsseldorf
22/02/2023 – “wire, Tube and Metec India” and “India Essen Welding+Cutting”
“wire, Tube and Metec India” and “India Essen Welding+Cutting”
From 23 to 25 November 2022 the Bombay Convention+Exhibition Center in Mumbai again served as the meeting point for the leading regional trade fairs of ...
21/02/2023 – Order for a Kocks Reducing+Sizing Block
Order for a Kocks Reducing+Sizing Block
Chinese special steel producer Baoshan Iron+Steel Co. Ltd., a subsidiary of the Baosteel Group, is to equip its new combined bar in coil/wire rod mill ...

“The aim is to enable expertise for a completely emission-free steel mill in 2050,” says Jukka Kömi, Professor at the University of Oulu. © University of Oulu
17/02/2023 – University of Oulu receives 1.6 million euros to expedite emission-free steel industry
University of Oulu receives 1.6 million euros to expedite emission-free steel industry
The Tiina and Antti Herlin Foundation’s significant four-year funding will be allocated to steel research and the promotion of carbon neutrality in the ...
16/02/2023 – Senior management team purchased business from current owners
Senior management team purchased business from current owners
Alloy Wire International (AWI)’s senior management team, comprising Managing Director Tom Mander, Technical Director Andrew Du Plessis and Finance Director ...
15/02/2023 – Optimize ferrochrome production capacity
Optimize ferrochrome production capacity
In mid February, Outokumpu restarted one of its three ferrochrome furnaces. Due to high electricity prices, the furnace was temporarily shut down in September ...

Starting in 2024, Schaeffler will purchase electricity from wind turbines with a total capacity of 18MW for five years. © Schaeffler
14/02/2023 – Supply contract covers around 8% of the electricity demand in Germany
Supply contract covers around 8% of the electricity demand in Germany
Automotive and industrial supplier Schaeffler will purchase electricity from wind turbines in the long term from Statkraft Markets GmbH, a leading international ...