Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

05/01/2021 – Electric arc furnace

Tenova started up a “Consteel EAF” at Acciaieria Arvedi

Tenova started up the most productive Electric Arc Furnace in history, a Tenova “Consteel EAF”, at Acciaieria Arvedi, Cremona (Italy).

Electric-Arc-furnance.jpg

The furnace has a tapping size of 300 metric tons and is designed to reach a power-ON time of 37 minutes. © Tenova

 
Electric-Arc-furnance.jpg

The furnace has a tapping size of 300 metric tons and is designed to reach a power-ON time of 37 minutes. © Tenova

 
Back to article

Further articles for:

  • Tenova
  • electric arc furnance
  • Acciaieria Arvedi
  • Consteel EAF
Jörg Dambock
Editor-in-chief

Jörg Dambock

Tenova

  Show company
  • Most read
  • Latest

14/11/2025

Steel cable stranding equipment

The future of stranding is here

By  Jörg Dambock

25/09/2025

Wire processing

Advanced CNC wire forming and tube bending solutions

By  Jörg Dambock

04/08/2025

Additional 8,000sqft of space and nearly £100,000 on new technology

AWI expands into additional units

By  Jörg Dambock

09/12/2025

Leadership transition at Thyssenkrupp Steel Europe

Marie Jaroni appointed CEO

By  Jörg Dambock

22/12/2025

Industry focus UK

Resilience and renewal: UK metals sector sets its sights on competitiveness

By  Jörg Dambock

26/12/2025

Elcowire sharpens strategy with stronger customer focus

Christoph Busch steps into a new role as Key Account Manager

By  Jörg Dambock

25/12/2025

Videx Multiple-Extrusion machine from Coil or Bars

Multiple-extrusion machine from coil or bars

By  Jörg Dambock

24/12/2025

Elcowire now even stronger in railway infrastructure solutions

Stephan Witte joins Elcowire in January

By  Jörg Dambock

23/12/2025

Compact design, maximum reliability, and simplified installation

Hybrid motor cable with PLTC-ER approval

By  Jörg Dambock

22/12/2025

Industry focus UK

Resilience and renewal: UK metals sector sets its sights on competitiveness

By  Jörg Dambock

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • Twitter
  • RSS Feed
Meisenbach Logo