Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

03/07/2020 – Heat treatment systems for electrical steel

Shougang places another major order with Tenova Loi

In the period 2000–2020, Tenova has received a total of 61 orders for heat treatment systems for electrical steel. 35 plants are completely new plants.

Gluehen-beschichten.jpg

Two of a total of seven previously delivered heat treatment plants for electrical steel to Shougang. © Tenova Loi

 
Gluehen-beschichten.jpg

Two of a total of seven previously delivered heat treatment plants for electrical steel to Shougang. © Tenova Loi

 
Back to article

Further articles for:

  • Tenova
  • Loi Thermprocess
  • heat treatment
  • Orders
Jörg Dambock
Editor-in-chief

Jörg Dambock

Tenova Loi Thermprocess

  Show company
  • Most read
  • Latest

02/04/2026

A long-term vision for spring manufacturing

Coiling the future

By  Jörg Dambock

30/06/2026

Borouge International accelerates the energy transformation

Advanced HVDC insulation system materials

By  Jörg Dambock

29/06/2026

Strengthens Wisco’s portfolio in high-end segments such as rail steel

New order for a 6-strand bloom caster

By  Jörg Dambock

26/06/2026

Acquisition

Troester expands its company portfolio with Troester Robotics

By  Jörg Dambock

29/06/2026

Most‑Read Insights

Top 5 of the Week – 26/2026

By  Daniel Keienburg

03/07/2026

More than 20 years of focus on the field of steel wire

Steel wire, steel wire strand and steel wire rope

By  Jörg Dambock

02/07/2026

Innovative core design cleanly peels to expose 900µm fiber reducing prep time

Belden introduces “Diamon Drop” single-fiber drop cable

By  Jörg Dambock

01/07/2026

How one “Combilift” has delivered safe operations for 28 years

The right tool for the job

By  Jörg Dambock

30/06/2026

Borouge International accelerates the energy transformation

Advanced HVDC insulation system materials

By  Jörg Dambock

29/06/2026

Most‑Read Insights

Top 5 of the Week – 26/2026

By  Daniel Keienburg

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • LinkedIn
  • RSS Feed
Meisenbach Logo