Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

14/12/2023 – Groundbreaking ceremony in Sweden to decarbonize the steel industry

SMS to build new electric arc furnace for SSAB for fossil-free steel production

SMS group has secured the contract from Nordic steelmaker SSAB to engineer, deliver and construct a new electric arc furnace (EAF) for steelmaking at SSAB’s site in Oxelösund, Sweden.

Previous image
SSAB.jpg

Early Illustration of the EAF building in Oxelösund, Sweden. © Lindblad Studio/Tengbom/AplusM

 
SMS-Group-SSAB-.jpg

Groundbreaking ceremony held at SSAB Oxelösund, Sweden, on November 28 with the Prime Minister of Sweden – Ulf Kristersson. © Henrik Hansson

 
SSAB.jpg

Early Illustration of the EAF building in Oxelösund, Sweden. © Lindblad Studio/Tengbom/AplusM

 
Back to article

Further articles for:

  • CO2 emissions
  • decarbonization
  • electric arc furnance
  • SMS Group
  • SSAB EMEA
Jörg Dambock
Editor-in-chief

Jörg Dambock

SMS group GmbH

  Show company
  • Most read
  • Latest

04/08/2025

Additional 8,000sqft of space and nearly £100,000 on new technology

AWI expands into additional units

By  Jörg Dambock

09/09/2025

Wire & Cable 25 Krakow: co-organised by IWMA

Shaping the future of wire and cable industry

By  Jörg Dambock

10/10/2025

Wire manufacturing / spring material

Complete line for efficient spring wire production

By  Jörg Dambock

07/10/2025

Management change

New leadership team in business area Americas and Group Functions

By  Jörg Dambock

08/10/2025

Spring manufacturing

Semi-automatic hydraulic unground spring presetting

By  Jörg Dambock

18/10/2025

The double pressure welding (DD) process for non-ferrous metals

Efficient and high-strength joints

By  Jörg Dambock

17/10/2025

Researchers aim to automate air gap measurement

Quality assurance in the production of electric motors

By  Jörg Dambock

17/10/2025

Cable & Wire Fair 2025, booth 3/R2-3

Large double twist stranders

By  Jörg Dambock

16/10/2025

Wireco introduces “Lazerlift”

New generation of rotation-resistant hoist ropes

By  Jörg Dambock

14/10/2025

Rewinding system with drum weights up to 10 tons

Heavy drums - efficiently rewound

By  Jörg Dambock

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • Twitter
  • RSS Feed
Meisenbach Logo