Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

09/09/2022 – Mohammed bin Rashid Al Maktoum Solar Park

Phase B of the 900-MW fifth phase has entered operation

As part of the world’s largest photovoltaic (PV) plant under construction, the project will aid Dubai’s push to upgrade and transform its energy mix by providing 2.268 billion kWh of power supply per year upon completion, enough to serve up over 240,000 homes and capable of reducing 1.1 million tons of carbon emission annually.

renewable-energy.jpg

Shanghai Electric announced that Phase B of the 900-MW fifth phase of the Mohammed bin Rashid Al Maktoum Solar Park has entered operation. © Shanghai Electric

 
renewable-energy.jpg

Shanghai Electric announced that Phase B of the 900-MW fifth phase of the Mohammed bin Rashid Al Maktoum Solar Park has entered operation. © Shanghai Electric

 
Back to article

Further articles for:

  • Shanghai Electric
  • renewable energy
  • Projects
  • Orders
Jörg Dambock
Editor-in-chief

Jörg Dambock

Shanghai Electric

  Show company
  • Most read
  • Latest

04/08/2025

Additional 8,000sqft of space and nearly £100,000 on new technology

AWI expands into additional units

By  Jörg Dambock

25/09/2025

Wire processing

Advanced CNC wire forming and tube bending solutions

By  Jörg Dambock

14/11/2025

Steel cable stranding equipment

The future of stranding is here

By  Jörg Dambock

24/11/2025

On our own account - WIRE

Review of the industry - week 47/2025

By  Daniel Keienburg

20/11/2025

“DLN 10” put to the test in reeal production conditions

Accuracy and defect detection

By  Jörg Dambock

28/11/2025

Wet blasting

Keeping wire conform extrusion dies in peak condition

By  Jörg Dambock

24/11/2025

On our own account - WIRE

Review of the industry - week 47/2025

By  Daniel Keienburg

20/11/2025

“DLN 10” put to the test in reeal production conditions

Accuracy and defect detection

By  Jörg Dambock

19/11/2025

Strategic move strengthens Elkabel’s vision for a smarter, data-driven manufacturing future

Elkabel accelerates digital transformation

By  Jörg Dambock

18/11/2025

On our own account - WIRE

Review of the industry - week 46/2025

By  Daniel Keienburg

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • Twitter
  • RSS Feed
Meisenbach Logo