Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

12/06/2025 – A major milestone towards the vessel delivery

Monna Lisa vessel reaches the launching

Mid May Prysmian celebrates a major milestone to enhance its global market-leading Transmission business with the completion of capacity expansion of its plant in Pikkala, Finland, together with the christening of its state-of-the-art cable laying vessel, the Prysmian “Monna Lisa”, which is now fully operational.

Next image
Vessel-ship-Monna-Lisa-Copyright-Prysmian.jpg

Prysmian Monna Lisa was christened at the Pikkala site, in Finland. © Prysmian

 
Vessel-ship-Monna-Lisa-Copyright-Prysmian.jpg

Prysmian Monna Lisa was christened at the Pikkala site, in Finland. © Prysmian

 
Monna-Lisa-Copyright-Prysmian.jpg

the christening of its state-of-the-art cable laying vessel, the Prysmian “Monna Lisa”, which is now fully operational. © Prysmian

 
Tower-Finland-Copyright-Prysmian.jpg

The new ‘Prysmian Tower’ is over 185m tall setting a new record for Finland and has been built to produce HVDC 525kV submarine cables in the most effective way. © Prysmian

 
Back to article

Further articles for:

  • Cable Laying Vessel
  • cable manufacture
  • Prysmian
Jörg Dambock
Editor-in-chief

Jörg Dambock

Prysmian S.p.A.

  Show company
  • Most read
  • Latest

13/08/2026

Management change

Rainer Brehm appointed president of “Automation” at Siemens

By  Jörg Dambock

14/08/2026

The world’s first twin “CMT 550” solution in Osceola, United States

SMS supplies Hybar with a second “CMT” mill

By  Jörg Dambock

12/08/2026

Management change

Wireco appoints Chief Operating Officer, North America

By  Jörg Dambock

06/08/2026

Madem Reels Group

First “Corporate Sustainability Report”

By  Jörg Dambock

17/08/2026

Most‑Read Insights

Top 5 of the Week – 33/2026

By  Daniel Keienburg

20/08/2026

Major upgrades allow to focus on high-margin premium products

Thyssenkrupp Steel issues final acceptance for slab caster

By  Jörg Dambock

17/08/2026

Most‑Read Insights

Top 5 of the Week – 33/2026

By  Daniel Keienburg

14/08/2026

The world’s first twin “CMT 550” solution in Osceola, United States

SMS supplies Hybar with a second “CMT” mill

By  Jörg Dambock

13/08/2026

Management change

Rainer Brehm appointed president of “Automation” at Siemens

By  Jörg Dambock

12/08/2026

Management change

Wireco appoints Chief Operating Officer, North America

By  Jörg Dambock

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • LinkedIn
  • RSS Feed
Meisenbach Logo