Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

19/05/2025 – Upgrade project generates electrical energy and electrode consumption savings

Baku Steel achieves improvements with EAF Upgrade

Primetals Technologies has recently received the final acceptance certificate (FAC) for an upgrade of the 60-ton electric arc furnace (EAF) at a facility operated by the Baku Steel Company CJSC group (BSC) located in Baku, Azerbaijan.

EAF-Baku-Copyright-Primetals.jpg

BSC achieves substantial improvements after an EAF upgrade by Primetals Technologies. © Primetals

 
EAF-Baku-Copyright-Primetals.jpg

BSC achieves substantial improvements after an EAF upgrade by Primetals Technologies. © Primetals

 
Back to article

Further articles for:

  • electric arc furnance
  • FAC
  • Final Acceptance Certificate
  • Index of machine tool orders
  • Primetals
Jörg Dambock
Editor-in-chief

Jörg Dambock

Primetals Technologies Austria GmbH

  Show company
  • Most read
  • Latest

12/01/2026

Advertorial

Springs and fastening machines & elements exclusive in hall 16

Messe Düsseldorf GmbH

09/01/2026

The Wire Association International, Inc.

David Fisher to lead WAI in 2026

By  Jörg Dambock

08/01/2026

Higher dome, greater visibility, and maximum flexibility

Werma expands its MC55 series with the "MC55 High"

By  Jörg Dambock

02/01/2026

Kocks 3-roll sizing block to boost product flexibility and operational performance

“RSB 370++/6“ strengthens modernization at North American Stainless

By  Jörg Dambock

12/01/2026

Most‑Read Insights

Top 5 of the Week – 2/2026

By  Daniel Keienburg

21/01/2026

Downtime minimized compared to conventional electrode arm installation

Tonggang optimizes ladle furnace performance

By  Jörg Dambock

20/01/2026

Evolving needs of today’s wire and cable manufacturing workforce

The WAI Education Center expands online video training courses

By  Jörg Dambock

19/01/2026

Most‑Read Insights

Top 5 of the Week – 3/2026

By  Daniel Keienburg

12/01/2026

Most‑Read Insights

Top 5 of the Week – 2/2026

By  Daniel Keienburg

12/01/2026

Advertorial

Springs and fastening machines & elements exclusive in hall 16

Messe Düsseldorf GmbH

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • Twitter
  • RSS Feed
Meisenbach Logo