19/05/2025 – Upgrade project generates electrical energy and electrode consumption savings
Baku Steel achieves improvements with EAF Upgrade
Primetals Technologies has recently received the final acceptance certificate (FAC) for an upgrade of the 60-ton electric arc furnace (EAF) at a facility operated by the Baku Steel Company CJSC group (BSC) located in Baku, Azerbaijan.