Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

25/05/2020 – HV and EHV cable production

Rosendahl has installed a new “RH-W” test line

“RH-W” is Rosendahl’s metal-forming and welding line for high-voltage and extra-high-voltage cables (HV/EHV). And now it is ready to be experienced live.

Next image
metal-tape.jpg

“RH-W” is set up for HV cables with a metal tube diameter up to 200mm. © Rosendahl Nextrom

 
metal-tape.jpg

“RH-W” is set up for HV cables with a metal tube diameter up to 200mm. © Rosendahl Nextrom

 
metal-tape.jpg

Rosendahl's “RH-W” metal tape forming and welding test line is ready to be seen. © Rosendahl Nextrom

 
Back to article

Further articles for:

  • Rosendahl Nextrom
  • cable manufacture
  • taping
  • joining
  • welding
  • metal-tape forming
Jörg Dambock
Editor-in-chief

Jörg Dambock

Rosendahl Nextrom GmbH

  Show company
  • Most read
  • Latest

25/09/2025

Wire processing

Advanced CNC wire forming and tube bending solutions

By  Jörg Dambock

04/02/2026

New 2-Strand Caster from Primetals Technologies

Maanshan Iron and Steel expands plant

By  Jörg Dambock

04/02/2026

Highly innovative system enables single-operator control of multiple plant sections

Primetals receives ‘Best of Industry’ award for its Central Operation Cockpit solution

By  Jörg Dambock

03/02/2026

SMS completes partial hearth repair in record time at Trinecké Železárny

Targeted partial hearth repair completed in just 42 days

By  Jörg Dambock

05/02/2026

Paul Wurth cast iron staves supplied by SMS Group

Dillinger improves blast furnace cooling

By  Jörg Dambock

10/02/2026

“Midrex” plant outputs 2.43 mio t in first year of operation

Tosyali Algérie sets new world DRI production record in 2025

By  Jörg Dambock

09/02/2026

Most‑Read Insights

Top 5 of the Week – 6/2026

By  Daniel Keienburg

05/02/2026

Paul Wurth cast iron staves supplied by SMS Group

Dillinger improves blast furnace cooling

By  Jörg Dambock

04/02/2026

New 2-Strand Caster from Primetals Technologies

Maanshan Iron and Steel expands plant

By  Jörg Dambock

04/02/2026

Highly innovative system enables single-operator control of multiple plant sections

Primetals receives ‘Best of Industry’ award for its Central Operation Cockpit solution

By  Jörg Dambock

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • LinkedIn
  • RSS Feed
Meisenbach Logo