Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

08/06/2022 – Wire drawing

More efficient production of bars and tubes

At “wire”, EJP will introduce three new developments that make the production of bars and tubes easier and more efficient. The new 12.5t chaintrack drawing unit now makes it possible to draw products with sensitive surfaces at even higher speeds.

Previous image
Stangen.jpg

With the driven polishing discs (below), the ratio between feed and speed of the bar can be changed during operation. © EJP

 
Pull-in-gripper.jpg

The pull-in gripper moving by a ball screw is pulling in the wire, which is then taken over by the chaintrack drawing system. © EJP Maschinen

 
Stangen.jpg

With the driven polishing discs (below), the ratio between feed and speed of the bar can be changed during operation. © EJP

 
Back to article

Further articles for:

  • EJP Maschinen
  • wire 2022
  • Wire processing
  • wire drawing
  • bars
Jörg Dambock
Editor-in-chief

Jörg Dambock

EJP Maschinen GmbH

  Show company
  • Most read
  • Latest

25/09/2025

Wire processing

Advanced CNC wire forming and tube bending solutions

By  Jörg Dambock

30/01/2026

RSB in regular production at Tata Steel in Jamshedpur

Successful integration in India

By  Jörg Dambock

02/02/2026

Most‑Read Insights

Top 5 of the Week – 5/2026

By  Daniel Keienburg

23/01/2026

“Guangzhou Industrial Technology 2026” to return in March

Expanded focus on robotics

By  Jörg Dambock

03/02/2026

SMS completes partial hearth repair in record time at Trinecké Železárny

Targeted partial hearth repair completed in just 42 days

By  Jörg Dambock

05/02/2026

Paul Wurth cast iron staves supplied by SMS Group

Dillinger improves blast furnace cooling

By  Jörg Dambock

04/02/2026

New 2-Strand Caster from Primetals Technologies

Maanshan Iron and Steel expands plant

By  Jörg Dambock

04/02/2026

Highly innovative system enables single-operator control of multiple plant sections

Primetals receives ‘Best of Industry’ award for its Central Operation Cockpit solution

By  Jörg Dambock

03/02/2026

SMS completes partial hearth repair in record time at Trinecké Železárny

Targeted partial hearth repair completed in just 42 days

By  Jörg Dambock

02/02/2026

Most‑Read Insights

Top 5 of the Week – 5/2026

By  Daniel Keienburg

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • LinkedIn
  • RSS Feed
Meisenbach Logo