Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

12/04/2024 – Cable markets

Construction of electricity highways picks up pace

The energy transition is increasingly being viewed in European terms. This is because it must guarantee secure, cross-border generation of electricity from renewable energies. One successful example is the “NordLink” connection between Germany and Norway. And more will follow as the construction of electricity highways worldwide is picking up pace. Major orders await cable manufacturers.

Previous image Next image
Underground-cable.jpg

The underground cable for the “NordLink” route is ready for transport. © Tennet

 
Offshore-Kabelverlegung.jpg

Meter by meter, the “NordLink” submarine cables are lowered into the sea © Tennet

 
Underground-cable.jpg

The underground cable for the “NordLink” route is ready for transport. © Tennet

 
vessel-ship.jpg

The submarine cables for “NordLink” are laid from a ship. © Tennet

 
Back to article

Further articles for:

  • cable manufacture
  • high voltage cables
  • Messe Düsseldorf
Jörg Dambock
Editor-in-chief

Jörg Dambock

Messe Düsseldorf GmbH

  Show company
  • Most read
  • Latest

04/08/2025

Additional 8,000sqft of space and nearly £100,000 on new technology

AWI expands into additional units

By  Jörg Dambock

09/09/2025

Wire & Cable 25 Krakow: co-organised by IWMA

Shaping the future of wire and cable industry

By  Jörg Dambock

10/10/2025

Wire manufacturing / spring material

Complete line for efficient spring wire production

By  Jörg Dambock

17/10/2025

Cable & Wire Fair 2025, booth 3/R2-3

Large double twist stranders

By  Jörg Dambock

07/10/2025

Management change

New leadership team in business area Americas and Group Functions

By  Jörg Dambock

19/10/2025

Tools

Precision engineering with TW and Nano pressure dies

By  Jörg Dambock

19/10/2025

Future-ready solutions for a growing nation

From building wire to e-mobility

By  Jörg Dambock

18/10/2025

The double pressure welding (DD) process for non-ferrous metals

Efficient and high-strength joints

By  Jörg Dambock

17/10/2025

Researchers aim to automate air gap measurement

Quality assurance in the production of electric motors

By  Jörg Dambock

17/10/2025

Cable & Wire Fair 2025, booth 3/R2-3

Large double twist stranders

By  Jörg Dambock

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • Twitter
  • RSS Feed
Meisenbach Logo