Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

12/04/2024 – Cable markets

Construction of electricity highways picks up pace

The energy transition is increasingly being viewed in European terms. This is because it must guarantee secure, cross-border generation of electricity from renewable energies. One successful example is the “NordLink” connection between Germany and Norway. And more will follow as the construction of electricity highways worldwide is picking up pace. Major orders await cable manufacturers.

Previous image Next image
Underground-cable.jpg

The underground cable for the “NordLink” route is ready for transport. © Tennet

 
Offshore-Kabelverlegung.jpg

Meter by meter, the “NordLink” submarine cables are lowered into the sea © Tennet

 
Underground-cable.jpg

The underground cable for the “NordLink” route is ready for transport. © Tennet

 
vessel-ship.jpg

The submarine cables for “NordLink” are laid from a ship. © Tennet

 
Back to article

Further articles for:

  • cable manufacture
  • high voltage cables
  • Messe Düsseldorf
Jörg Dambock
Editor-in-chief

Jörg Dambock

Messe Düsseldorf GmbH

  Show company
  • Most read
  • Latest

06/04/2026

Heat treatment

The future of heat treatment and sustainable production

By  Jörg Dambock

07/09/2026

Congratulations

Our most distant reader: Taiwan Simco Company

By  Jörg Dambock

08/09/2026

75 years of WIRE (1951 – 2026)

Special anniversary page

By  Jörg Dambock

08/09/2026

Wire processing / Springs manufacturing

A powerful duo tackling the skilled labor shortage

By  Jörg Dambock

02/09/2026

wire China 2026 / Preview

IWMA set for biggest-ever presence at “wire China”

By  Jörg Dambock

13/09/2026

wire China 2026 / Preview

Cheng I Machinery highlights advanced solutions

By  Jörg Dambock

13/09/2026

wire China 2026 / Preview

From shop-floor data to AI-driven manufacturing decisions

By  Jörg Dambock

11/09/2026

wire China 2026 / Preview

Complete extrusion systems for the cable industry

By  Jörg Dambock

10/09/2026

wire China 2026 /Preview

Future-oriented wire and cable manufacturing equipment

By  Jörg Dambock

09/09/2026

wire China 2026 / Preview

Shaping the future of wire and cable manufacturing

By  Jörg Dambock

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • LinkedIn
  • RSS Feed
Meisenbach Logo