Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

30/12/2024 – Marcegaglia’s partnership with Primetals Technologies

Significant productivity improvements

Marcegaglia Stainless Sheffield, based in the UK, has partnered with Primetals Technologies to optimize production processes across its Sheffield minimill. The modernization project aims to double the plant's annual production capacity from 250,000t to 500,000t.

Macregalia.jpg

Marcegaglia will equip all the production units of the minimill meltshop in Sheffield with automation systems from Primetals Technologies. © Priemtals

 
Macregalia.jpg

Marcegaglia will equip all the production units of the minimill meltshop in Sheffield with automation systems from Primetals Technologies. © Priemtals

 
Back to article

Further articles for:

  • electric arc furnance
  • Marcegaglia
  • Orders
  • Primetals
Jörg Dambock
Editor-in-chief

Jörg Dambock

Primetals Technologies Austria GmbH

  Show company
  • Most read
  • Latest

12/01/2026

Advertorial

Springs and fastening machines & elements exclusive in hall 16

Messe Düsseldorf GmbH

09/01/2026

The Wire Association International, Inc.

David Fisher to lead WAI in 2026

By  Jörg Dambock

08/01/2026

Higher dome, greater visibility, and maximum flexibility

Werma expands its MC55 series with the "MC55 High"

By  Jörg Dambock

12/01/2026

Most‑Read Insights

Top 5 of the Week – 2/2026

By  Daniel Keienburg

02/01/2026

Kocks 3-roll sizing block to boost product flexibility and operational performance

“RSB 370++/6“ strengthens modernization at North American Stainless

By  Jörg Dambock

21/01/2026

Downtime minimized compared to conventional electrode arm installation

Tonggang optimizes ladle furnace performance

By  Jörg Dambock

20/01/2026

Evolving needs of today’s wire and cable manufacturing workforce

The WAI Education Center expands online video training courses

By  Jörg Dambock

19/01/2026

Most‑Read Insights

Top 5 of the Week – 3/2026

By  Daniel Keienburg

12/01/2026

Most‑Read Insights

Top 5 of the Week – 2/2026

By  Daniel Keienburg

12/01/2026

Advertorial

Springs and fastening machines & elements exclusive in hall 16

Messe Düsseldorf GmbH

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • Twitter
  • RSS Feed
Meisenbach Logo