Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

23/12/2024 – Order from USA

Primetals supplies EAF Ultimate with Active Power Feeder solution

A steel producer based in the U.S.A. has recently awarded Primetals Technologies a contract for the engineering, supply, and startup of a 68-ton EAF Ultimate electric arc furnace (EAF) integrated with Active Power Feeder power supply technology. Startup is scheduled for the end of 2026.

EAF.jpg

Primetals Technologies will supply an EAF Ultimate integrated with Active Power Feeder power supply technology to a U.S.-based steel producer. © Primetals

 
EAF.jpg

Primetals Technologies will supply an EAF Ultimate integrated with Active Power Feeder power supply technology to a U.S.-based steel producer. © Primetals

 
Back to article

Further articles for:

  • Electric Arc Furnace
  • Orders
  • Primetals
Jörg Dambock
Editor-in-chief

Jörg Dambock

Primetals Technologies Austria GmbH

  Show company
  • Most read
  • Latest

25/09/2025

Wire processing

Advanced CNC wire forming and tube bending solutions

By  Jörg Dambock

03/02/2026

SMS completes partial hearth repair in record time at Trinecké Železárny

Targeted partial hearth repair completed in just 42 days

By  Jörg Dambock

02/02/2026

Most‑Read Insights

Top 5 of the Week – 5/2026

By  Daniel Keienburg

04/02/2026

New 2-Strand Caster from Primetals Technologies

Maanshan Iron and Steel expands plant

By  Jörg Dambock

23/01/2026

“Guangzhou Industrial Technology 2026” to return in March

Expanded focus on robotics

By  Jörg Dambock

05/02/2026

Paul Wurth cast iron staves supplied by SMS Group

Dillinger improves blast furnace cooling

By  Jörg Dambock

04/02/2026

New 2-Strand Caster from Primetals Technologies

Maanshan Iron and Steel expands plant

By  Jörg Dambock

04/02/2026

Highly innovative system enables single-operator control of multiple plant sections

Primetals receives ‘Best of Industry’ award for its Central Operation Cockpit solution

By  Jörg Dambock

03/02/2026

SMS completes partial hearth repair in record time at Trinecké Železárny

Targeted partial hearth repair completed in just 42 days

By  Jörg Dambock

02/02/2026

Most‑Read Insights

Top 5 of the Week – 5/2026

By  Daniel Keienburg

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • LinkedIn
  • RSS Feed
Meisenbach Logo