28/12/2021 – Installation is due to start in 2023
Nexans to connect Oseberg Field Centre with renewable energy
Nexans will manufacture and install the tailer-made power cable solution to connect Oseberg with power from mainland Norway. Cables will be manufactured in Nexans’ Halden facility and provide about 50% reduction in greenhouse gas emissions.