Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

28/12/2021 – Installation is due to start in 2023

Nexans to connect Oseberg Field Centre with renewable energy

Nexans will manufacture and install the tailer-made power cable solution to connect Oseberg with power from mainland Norway. Cables will be manufactured in Nexans’ Halden facility and provide about 50% reduction in greenhouse gas emissions.

Nexans-connect-Oseberg-Field.jpg

The cable system consists of a one 3-core 132kV AC cable with the capacity to transport and supply 180MW to the main platform at Oseberg. © Nexans

 
Nexans-connect-Oseberg-Field.jpg

The cable system consists of a one 3-core 132kV AC cable with the capacity to transport and supply 180MW to the main platform at Oseberg. © Nexans

 
Back to article

Further articles for:

  • Nexans
  • Projects
  • Orders
  • cable laying
  • cable manufacture
  • renewable energy
Jörg Dambock
Editor-in-chief

Jörg Dambock

Nexans

  Show company
  • Most read
  • Latest

21/07/2026

Primetals Technologies receives FAC from Hyundai Dangjin

“Trim Rob”, the first robotic coil trimming and sampling system

By  Jörg Dambock

20/07/2026

Quality management

Surface quality and geometry control in a single device

By  Jörg Dambock

14/07/2026

Surface treatment

Utrasonic cleaning systems, specially tailored

By  Jörg Dambock

27/07/2026

Most‑Read Insights

Top 5 of the Week – 30/2026

By  Daniel Keienburg

27/05/2026

Aossociations

Worldstainless Board elects new chairman

By  Jörg Dambock

30/07/2026

Signing Ceremony for biggest Kocks 3-roll block

Jiyuan orders “RSB 500++/4” for new big bar mill line

By  Jörg Dambock

28/07/2026

Italy: Machine tool order index

Order index still falling in the second quarter of 2026

By  Jörg Dambock

27/07/2026

Most‑Read Insights

Top 5 of the Week – 30/2026

By  Daniel Keienburg

23/07/2026

Generous donation from a local manufacturer

Black Country Air Cadets take off with £5000 grant

By  Jörg Dambock

22/07/2026

Second-hand six-high Demag mill to be upgraded to a 1,250mm six-high “CVC plus”

SMS transform previously owned cold rolling mill into sustainable copper strip solution

By  Jörg Dambock

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • LinkedIn
  • RSS Feed
Meisenbach Logo