Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

10/05/2022 – Tenova received two contracts from Tenaris

Investment in special steel production

Tenova, developer and provider of sustainable solutions for the green transition of the metals industry, was awarded two contracts by Tenaris, global manufacturer and supplier of steel pipes and related services, for its mill in Dalmine (Italy). Both contracts are related to the steelmaker’s new investment in special steel production. The two companies belong to the Techint Group.

Tenaris-furnance.jpg

The installation of a new furnace 100% H2 ready is part of Tenaris commitment to reducing the environmental impact of its activity. © Tenova

 
Tenaris-furnance.jpg

The installation of a new furnace 100% H2 ready is part of Tenaris commitment to reducing the environmental impact of its activity. © Tenova

 
Back to article

Further articles for:

  • Orders
  • Tenova
  • Tenova Italimpianti
  • Tenaris
  • Techint Group
  • heat treatment
  • special steel
  • furnace
Jörg Dambock
Editor-in-chief

Jörg Dambock

Tenova

  Show company
  • Most read
  • Latest

14/10/2026

Wire manufacture

Integrated solutions for welding wire production

by Ann Kathrin Hassenburs

20/10/2026

Coiling the future

Carrying forward an italian engineering legacy

By  Jörg Dambock

19/10/2026

Most‑Read Insights

Top 5 of the Week – 42/2026

By  Daniel Keienburg

08/10/2026

Eder Engineering-Austria celebrates its 80th anniversary

Requirements change, but the goal remains the same

By  Jörg Dambock

22/10/2026

Spring manufacturing

NASA returns to spring manufacturer for second Mars rover programme

By  Jörg Dambock

22/10/2026

Spring manufacturing

NASA returns to spring manufacturer for second Mars rover programme

By  Jörg Dambock

21/10/2026

Quality management

Belden reduces scrap materials and production costs

By  Jörg Dambock

20/10/2026

Coiling the future

Carrying forward an italian engineering legacy

By  Jörg Dambock

19/10/2026

Most‑Read Insights

Top 5 of the Week – 42/2026

By  Daniel Keienburg

14/10/2026

Wire manufacture

Integrated solutions for welding wire production

by Ann Kathrin Hassenburs

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • LinkedIn
  • RSS Feed
Meisenbach Logo