Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

29/12/2025 – LESS and Responsible Steel join forces

Interoperability tool for transparent steel decarbonisation

In a major step toward aligning global steel decarbonisation efforts, the Low Emission Steel Standard (LESS) and Responsible Steel have announced their intention to develop an interoperability tool designed to enhance transparency and comparability of greenhouse gas emissions in steel production.

Previous image
Gunnar-Groebler-Copyright-Salzgitter.jpg

Gunnar Groebler, CEO of Salzgitter AG and Chairman of the Board of LESS, added: "Harmonised standards are the backbone of meaningful change in steel production.” © Salzgitter

 
Frederik-van-de-Velde-Copyright-Arcelor-Mittal.jpg

Frederik Van de Velde, CEO of Arcelor Mittal Belgium and a member of both LESS and ResponsibleSteel, stated: "This partnership is a game-changer for our industry.” © Arcelor Mittal

 
Gunnar-Groebler-Copyright-Salzgitter.jpg

Gunnar Groebler, CEO of Salzgitter AG and Chairman of the Board of LESS, added: "Harmonised standards are the backbone of meaningful change in steel production.” © Salzgitter

 
Back to article

Further articles for:

  • Associations
  • Steel
  • Less
Jörg Dambock
Editor-in-chief

Jörg Dambock

Less aisbl

  Show company
  • Most read
  • Latest

25/09/2025

Wire processing

Advanced CNC wire forming and tube bending solutions

By  Jörg Dambock

03/02/2026

SMS completes partial hearth repair in record time at Trinecké Železárny

Targeted partial hearth repair completed in just 42 days

By  Jörg Dambock

02/02/2026

Most‑Read Insights

Top 5 of the Week – 5/2026

By  Daniel Keienburg

04/02/2026

New 2-Strand Caster from Primetals Technologies

Maanshan Iron and Steel expands plant

By  Jörg Dambock

23/01/2026

“Guangzhou Industrial Technology 2026” to return in March

Expanded focus on robotics

By  Jörg Dambock

05/02/2026

Paul Wurth cast iron staves supplied by SMS Group

Dillinger improves blast furnace cooling

By  Jörg Dambock

04/02/2026

New 2-Strand Caster from Primetals Technologies

Maanshan Iron and Steel expands plant

By  Jörg Dambock

04/02/2026

Highly innovative system enables single-operator control of multiple plant sections

Primetals receives ‘Best of Industry’ award for its Central Operation Cockpit solution

By  Jörg Dambock

03/02/2026

SMS completes partial hearth repair in record time at Trinecké Železárny

Targeted partial hearth repair completed in just 42 days

By  Jörg Dambock

02/02/2026

Most‑Read Insights

Top 5 of the Week – 5/2026

By  Daniel Keienburg

  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • LinkedIn
  • RSS Feed
Meisenbach Logo