Business

Extruder.jpg

Cimteq-Webinar: How to continuously improve cable designs and business processes with “Cable Builder”. © Cimteq

 
07/01/2022 – How to continuously improve cable designs and business processes

How to continuously improve cable designs and business processes

Cimteq invites to “Cable Builder“-webinar

Cimteq, software supplier to the wire and cable manufacturing industry, invites manufacturers to sign up to attend their webinar on Wednesday 2nd February ... By  Jörg Dambock
Wire-Expo-2022.png

Biennial “Wire Expo 2022” will run June 7-8, 2022 in Dallas, Texas/USA. © WAI

 
05/01/2022 – “WAI Operations Summit” and “Wire Expo 2022” June 7-8, 2022

“WAI Operations Summit” and “Wire Expo 2022” June 7-8, 2022

70% of exhibit space has been sold

The Wire Association International (WAI), Inc. reports that 70% of exhibit space has been sold for its biennial “Wire Expo 2022”, which will be staged ... By  Jörg Dambock
eldec-induction-GmbH.png

EMAG eldec GmbH becomes eldec Induction GmbH. All jobs will be retained. © eldec

 
05/01/2022 – Management buy-out

Management buy-out

EMAG sells EMAG eldec GmbH

EMAG eldec GmbH becomes „eldec Induction GmbH“. All jobs will be retained. The previous managing director Thomas Rank takes over the shares of eldec GmbH ... By  Jörg Dambock
James-R-York-WAI-president.jpg

James R. York is the new WAI-president for a one-year term that commenced on January 1, 2022. © WAI

 
04/01/2022 – The Wire Association International announces appointment

The Wire Association International announces appointment

York to lead WAI in 2022

The Wire Association International (WAI), Inc. announces the appointment of James R. York as president of the association for a one-year term that commenced ... By  Jörg Dambock
2021 Retrospect

We say goodbye to 2020 with a retrospect at our most clicked articles of the year! © Robert Kneschke/stock.adobe.com

 
03/01/2022 – On our own behalf - Wire

On our own behalf - Wire

Industry retrospect 2021

Which news and topics moved our readers in 2021? We'll tell you in our annual retrospect! By  Editorial staff
Nexans-connect-Oseberg-Field.jpg

The cable system consists of a one 3-core 132kV AC cable with the capacity to transport and supply 180MW to the main platform at Oseberg. © Nexans

 
28/12/2021 – Installation is due to start in 2023

Installation is due to start in 2023

Nexans to connect Oseberg Field Centre with renewable energy

Nexans will manufacture and install the tailer-made power cable solution to connect Oseberg with power from mainland Norway. Cables will be manufactured ... By  Jörg Dambock
Extrusion.jpg

Erocarb “E4HN31” skin-foam-skin + stripe(s) crosshead for 4 extruders. © Erocarb

 
27/12/2021 – On our own behalf - Wire

On our own behalf - Wire

Week 51/2021 in retrospect

Here, we present you the top articles from our four categories. This week, the most read one comes from the category „Reports“. By  Daniel Keienburg